How to Install a Steel Chain Conveyor with Ground Pit Feeding System


Get Quote | Ask Engineer | Installation SeriveVideo Demo

 

Installing a steel chain conveyor with a ground pit feeding system is a common solution in modern recycling, shredding, and baling plants.
This FAQ page answers the most frequently asked questions from plant managers, engineers, and installation teams.

1. What is a Ground Pit Feeding Steel Chain Conveyor?

A ground pit feeding system means the conveyor inlet is installed below floor level inside a civil foundation pit.

This allows materials to be:

  • Loaded directly from the ground
  • Fed by loaders or manual operation
  • Transferred continuously to downstream equipment

Typical applications include:

  • Waste sorting plants
  • Shredders and balers feeding systems
  • Scrap and bulky waste handling

2. Why Must a Pit Be Prepared Before Installation?

The pit is essential because it allows the feeding inlet to sit flush with the ground surface.

Benefits include:

✅ Easy ground-level feeding
✅ Reduced lifting equipment use
✅ Improved safety for operators
✅ Higher feeding efficiency
✅ Better plant layout integration

Without a pit, operators would need ramps or elevated platforms.

 

3. How Deep Should the Installation Pit Be?

The pit depth depends on:

  • Conveyor model
  • Chain height
  • Hopper structure
  • Required feeding angle

General guideline:
The feeding opening should align with finished floor height.

👉 Always follow the manufacturer’s foundation drawing for exact dimensions.

4. How Is the Steel Chain Conveyor Installed Into the Pit?

Installation steps normally include:

  1. Lift conveyor using crane or forklift
  2. Slowly lower feeding inlet into pit
  3. Align conveyor centerline with downstream equipment
  4. Adjust height and horizontal level
  5. Fix anchor bolts securely

⚠️ Avoid twisting or uneven lifting to protect chain alignment.

5. Should the Conveyor Inlet Be Level With the Ground?

Yes — this is critical.

The inlet should be:

  • Flush with the ground surface
  • Accessible for loaders or manual feeding
  • Free from gaps that may trap materials

Correct positioning ensures materials can be directly thrown or pushed into the conveyor.

6. What Equipment Is Commonly Connected After the Conveyor?

Steel chain conveyors typically feed:

They function as the primary automatic feeding solution.

 

7. What Are Common Installation Mistakes?

Common issues include:

❌ Incorrect pit dimensions
❌ Feeding inlet higher than ground level
❌ Poor leveling causing chain deviation
❌ No drainage design
❌ Misalignment with shredder or baler

Proper planning avoids costly reinstallation.

PRIVACY POLICY

We collect information from you when you fill out an inquiry or contact form.  When submitting the form on our site, you may be asked to enter your name and contact details such as: e-mail address, mailing address and/or phone number, etc. Alternatively, you can choose not to complete our forms and visit our site anonymously.  Any of the information we collect from you may be used to help us to better respond to your individual needs, and/or enable us to more effectively respond to your customer service requests and support needs.  The email address you provided may also be used to send you information and updates pertaining to your inquiry and/or order, in addition to receiving occasional company news, updates, related product or service information, etc. SINOBALER does not sell, trade, or otherwise transfer to outside parties your personally identifiable information. This does not include trusted third parties who assist us in operating our website, conducting our business, or servicing you, so long as those parties agree to keep this information confidential. We may also release your information when we believe release is appropriate to comply with the law, enforce our site policies, or protect ours or others rights, property, or safety.

 

By using our site, you consent to our online privacy policy.  If we decide to change our privacy policy, we will post those changes on this page.  If you have any questions or concerns regarding our privacy policy, please e-mail info@sinobaler.com or mail your question to us at 1206 Yinzhou Shanghui Nan Lou, 1299 Yinxian Avenue, Yinzhou District, Ningbo 315192, P.R. China.

 

EXTERNAL LINKS & DISCLAIMER

Our web site has links to many other organizations with their permission. Upon leaving the SINOBALER web site, you are subject to the privacy policy of the new site which are not under our control. SINOBALER is not responsible for the content of any linked site or any link contained in a linked site.  These links are provided to you as a service for you to better understand the different business relationships that SINOBALER has established, and/or to point the reader to other possible relevant resources.